Construction & Engineering
What actually moved on site between two dates — across the whole footprint, not sampled at a handful of stations.
What Parallax delivers here- Earthwork, measured Cut and fill over the entire site, with the detection limit stated alongside it.
- Progress you can attribute Every area of change isolated, so progress and SAL documentation map to a part of the site.
- Stockpiles where they stand Volumes taken in place, with nobody walking the pile to get them.
- Ground movement around the site Settlement of the site and its neighbours followed over months, from satellite archives.
- Buried utilities before the dig Pipes, cables and ducts located and depth-tagged ahead of excavation.